AxyoAxyo Request a demo
AI-nativeStockouts and Lost Sales
Revenue

Never run out, without having to pile up stock

Most stockouts aren’t caused by too little stock. Axyo spots demand, stock and supply getting out of step, and warns you before anything runs out.

You swing between running out and having too much.

Rush orders and extra safety stock fix today’s stockout and create tomorrow’s excess.

Each fix creates the next problem, and you find out when an order can’t ship.

Axyo warns weeks before an item runs out, so you have time to choose the right fix, not just the fastest one.

Small gaps add up across every item at every site.

No team can keep demand, stock and supply in step by hand, across thousands of items.

Illustrative example

About $3.2Ma year in lost sales, which costs about $850K of gross profit1

This week, 56 items are heading for a stockout:

  • 23demand jumped ahead of the forecast
  • 14waiting on a late shipment
  • 9stock at the wrong site
  • 6stock promised to other orders
  • 4the count is wrong
Each square is one item at one site. The red ones are heading for a stockout this week, and Axyo warns you about each one before it runs out.

Every 1% of revenue lost to stockouts costs you $665K of gross profit a year.

The right fix is different for each item at each site.

Raising safety stock everywhere ties up cash in slow items, and you still run out when demand jumps or a supplier is late.

Illustrative examples

Stock is at the wrong siteCopper building wire · Las Vegas

+20%safety stockMove60 reels from Tucson

Still runs out in 16 days. The extra stock arrives too late.

Demand jumped in Las Vegas, and Tucson has extra. Warned 16 days ahead, with no new stock bought. $64K of sales kept

Stock is low, but an order is already on the way200A breaker panels · Tucson

+20%safety stockNo orderthe open order covers it

Ties up $18K in stock it doesn’t need.

The open order lands in 9 days, before stock runs low. $18K of working capital freed up

Demand changed, but the reorder point hasn’tConduit fittings · Albuquerque

+20%safety stockOrder 400now, not 1,200 later

Still runs out. Demand doubled with a new job, and 20% doesn’t cover it.

Warned 3 weeks ahead. A smaller order now covers the job without leaving extra stock behind. $27K of sales kept

The supplier is lateLED drivers · Phoenix

+20%safety stock200 by airthe rest stays on the ship

Still runs out. The supplier is 3 weeks late.

Warned 3 weeks ahead. $2,100 to expedite, not $9,000 for the whole order. $46K of sales kept

Axyo checks each item’s forecast, stock at every site, open orders and supplier lead times, continuously, and recommends the lowest-cost fix.

Axyo recommends. Your team decides.

Small, routine fixes go through within limits you set. Bigger ones wait for your approval.

Illustrative example, one week
Axyo’s recommendations
Your rules
  • In-stock target, key items98%
  • Most stock to hold12 weeks
  • ExpeditingYou approve
  • Goes through on its ownUnder $5K

You can change these rules any time.

212 small fixesapplied automatically, within your rules
  • Reorder amounts updated on 124 items
  • Short stock reserved for key accounts on 50 order lines
  • Stock moved between sites for 38 items
4 bigger changes wait for your approval$289K of sales at stake
  • LED drivers, PhoenixAir-freight 200. The supplier is 3 weeks late.
    $46K

    Held. Reason recorded, and Axyo keeps watching.

  • Service entrance cable, 3 sitesOrder 900 reels now, ahead of spring demand.
    $120K

    Held. Reason recorded, and Axyo keeps watching.

  • 200A breaker panelsAdd a second supplier. The current one is on allocation through March.
    $85K

    Held. Reason recorded, and Axyo keeps watching.

  • LED high-bay fixturesStart stocking. Contractors asked for them 30 times last month.
    $38K

    Held. Reason recorded, and Axyo keeps watching.

What Axyo watches, continuously

Each risk to stock, by item and site, in your own data and in external signals.

Questions we hear

Our ERP already has reorder points.

A reorder point is set once and triggers only when stock drops below it, often weeks after demand changed. Axyo checks each item’s forecast, stock at every site and open orders continuously, warns you before the item runs short, and recommends the fix. It also keeps the reorder points themselves up to date.

Why not just carry more stock?

Extra stock ties up working capital on every item, and most stockouts happen anyway: demand jumps, a supplier is late, or the stock is at the wrong site. Axyo puts stock where it is needed and lets you hold less of the items that don’t need it, which frees up working capital.

Won’t preventing stockouts mean more inventory?

No. Most fixes use stock you already have or have on order: moving it between sites, reserving it for key orders, or timing the next order better. Where Axyo recommends buying more, it weighs the sales at risk against the working capital it ties up.

Our customers wait for backorders.

Some do. Others cancel the line, take a substitute or buy it elsewhere, and the rest of the order can go with it. Axyo shows which backorders were filled, which lines were canceled, and which customers bought less afterward.

We don’t track lost sales.

Axyo works it out from data you already have: lines closed short or canceled, backorders, substitutes, quotes that never became orders, and customers who bought less after a stockout.

Our suppliers are the problem.

Often they are part of it. Axyo warns you when a supplier confirms a later date, a purchase order slips or lead times grow, and recommends how to cover it: stock at another site, a partial expedite or another supplier. Supplier Performance and Risk covers your suppliers in depth.

Our demand is lumpy and driven by projects.

Axyo forecasts each item by its own demand pattern, and treats project and promotion demand as one-off demand, so it doesn’t inflate the next forecast. It warns you when orders run ahead of the forecast, while there is still time to act.

We have several branches.

That’s where Axyo helps most. It sees stock at every site and on order, and recommends moving stock or shipping from another site before buying more.

How early will we know?

As soon as demand, stock and supply start to drift apart: orders run ahead of the forecast, a supplier confirms a later date, or a purchase order slips. That is usually weeks before the item runs out, while moving stock or a smaller order still works.

What data do you need?

Sales orders and invoices, stock on hand by site, open purchase orders and receipts, supplier lead times, and your current reorder settings. Most of it is already in your ERP.

Sources

1. Based on Axyo’s $250M sample distributor with a 26.6% gross margin: about $3.2M of sales a year, about 1.3% of revenue, lost to stockouts, which costs about $850K of gross profit.

The other figures on this page are illustrative.

Related: Excess and Dead StockSupplier Performance and RiskSupplier Lead Times

Start with a free Value Assessment

Find out how much you lost to stockouts last year, where, and why

  1. 1Send 12 months of sales, stock and purchase data
  2. 2See which items ran out, why, and what it cost
  3. 3Try it on one product line*

* Or one site. We agree in writing, before the trial starts, what success looks like, and compare the results with the rest of your business. Examples on this page are illustrative.