Production Delays

Start every build with every part in hand

One missing part can stop a build. Axyo checks every scheduled build against every part, supplier date and work center, weeks ahead, and tells you what to fix first.

Sample warningIllustrative

Work order 2207 can’t start on Nov 23. One part is missing.

Bill of materials213 of 214 parts in hand
$186Korder waits on one part
9 daysto act

Fix: buy the breaker from a distributor that has it in stock, for a $2,200 premium.

72%of manufacturers found a shortage only after a delay was unavoidable1
51%take a week or longer to decide how to fix a shortage1
64%spend 10% or more of their manufacturing budget reacting to disruptions1
Why it’s found too late

Your ERP lists shortages. It doesn’t tell you which builds will stop

From shortage list to the builds that will stopIllustrative
1,800shortage lines in your ERP

Traced up through every level of the bill of materials

23builds they touch

Checked against supplier dates, stock and capacity

6builds that will stop, with $1.1M of shipments

It lists parts, not the builds they stop. A part short three levels down holds up a subassembly, and the subassembly holds up the build.

It trusts every supplier date and every work center. Dates slide each week, and it assumes there is room on the floor.

Parts are shared across builds and subassemblies. Fixing one build can starve another.

A part can be late, never ordered, not really on the shelf, or stuck behind a full work center. No team can trace all of this continuously, by hand, for every build.

How Axyo helps

Axyo shows which builds will stop, weeks ahead, and what to do

1Checks every build, weeks ahead

Every part at every level of the bill of materials, against supplier dates, stock records and work center capacity, together.

2Shows only the builds that will stop

With the part that stops each one, the shipments at stake and the days left to act.

3Gives the fix, ranked

Buy from another source, swap builds, order what a design change added, recount stock or move work. Decide in minutes, not a week.

Estimate

Estimate what production delays cost your business

Set your revenue. Your free assessment uses your real numbers.

$120M
$20M$2B
Assumptions

The cost of delays and the share kept are from the sample business in Axyo’s value model: expediting, overtime, idle crews, penalties and lost orders.2

Lost to production delays, every year$2.15M1.8% of revenue
Kept with Axyo, every year$1.05M49% of it
Added to operating profit10.3%more operating profit, every year
Why it happens

Why builds slip

Each has its own cause, and its own fix.

The schedule assumes capacity you don’t have

Every build is scheduled as if each work center had room. One doesn’t, and the builds behind it wait.

What your current tools miss

Each one sees part of it. None checks every build against parts, supplier dates and capacity, weeks ahead.

Sees itPartlyMisses it

What Axyo does

A warning with the fix, for each cause

Axyo checks every scheduled build against parts and capacity, continuously. When a build will be short, the right person gets the fix and what it’s worth.

Your rules, your call

Routine checks run on their own. Schedule changes, overtime and buying go to a person.

SettingsExample
ActionHow it runsApplies to
Request counts for suspect stockRecommendAutopilotNext week’s builds
Buy short parts from distributor stockRecommendAutopilotUp to a 10% premium
Swap builds in the scheduleRecommendAutopilotSame week only
Add overtime at a bottleneckRecommendAutopilotPlant manager
Warn me above$100,000
Look ahead6 weeks
Warn when a work center passes100%
Who gets which warningPurchasingPlanningPlantFinance
See it work

A sample Value Assessment

What you get about a week after you send your files. Illustrative

The same assessment also shows which suppliers ship late, order by order. See Supplier Lead Times.
How it works

From your data to a warning with the fix

Each layer builds on the one before it.

Next: Get started
Get started

Start with a free Value Assessment

Results in about a week, live warnings from week two.

Day 1Files

Send five spreadsheet exports. See the list

Week 1Results

What delays cost you, by cause, product line and short part, and today’s cases.

Week 2Review

Go over the results with Axyo and agree on first actions.

Week 2 onWarnings

Ongoing warnings start, and a direct ERP connection replaces the spreadsheets.

To agree on in the first meeting
  • Which product lines and work centers to start with
  • How far ahead to look, and when a work center counts as overloaded
  • Your dollar threshold for warnings
  • Who gets which warnings: purchasing, planning, the plant, finance
  • Which ERP connection to set up after the spreadsheets

Annual subscription, billed monthly, cancel anytime. The assessment shows the payback before you commit.

Who benefits

Frequently asked questions

We’ve built this before, at enterprise scale

Fortune 100payments company where our founders built the risk, data and customer 360 platforms
1,000+key risk indicators monitored there
Hoursfrom signal to alert
30+data and AI patents held by our founders

See it in your business.

Send five files. In about a week, see what delays cost you last year, by cause and product line, and which builds in the next six weeks will be short.

Sources and notes
  1. 1
    LeanDNA, 2026 supply chain study by Wakefield Research, 150 senior decision makers at discrete manufacturers with at least $250M in revenue, March 2026, released Apr 9, 2026: 72% discovered a material shortage only after production delays were unavoidable, 51% take a week or longer to determine corrective action, and 64% spend 10% or more of their manufacturing budget reacting to disruptions through premium freight, emergency sourcing and last-minute production changes. Source. Reported by Material Handling and Logistics, Apr 15, 2026. Source
  2. 2
    Axyo’s value model, built on a $120M-revenue electrical equipment manufacturer with an 8.5% operating margin: about $2.15M a year, 1.8% of revenue, lost to production delays through expediting and premium freight, overtime, idle crews, late-delivery penalties and lost orders. About 49% of it can be kept, and on-time builds rise from 83% to about 93%.
  3. 3
    The sample business, its customers, suppliers, parts, work orders, cases and amounts are illustrative: fictional, with realistic patterns. Your assessment uses your own data and external signals.
Illustrative examples3