Know when supply will really arrive

Planned lead times drift and open orders go quiet. Axyo spots supply that will arrive after it’s needed, and recommends the lowest-cost fix while there’s still time to act.

The date in your ERP isn’t when supply arrives.

Lead times drift from what you plan on, and open orders slip without anyone telling you.

Illustrative example, five open order lines

Every line looks on time. You find out when the shelf is empty or the customer calls.

Axyo predicts when each line will really arrive. It flags only the ones that will arrive too late.

Late supply adds up across every order line.

No team can chase every purchase order line with every supplier, continuously.

Illustrative example

About $630Ka year in rush freight that better-run peers don’t pay1

This week, 74 open order lines will arrive after they’re needed:

  • 26confirmed dates that are likely to slip
  • 18never confirmed by the supplier
  • 14past due, with no new date
  • 9shipped short, and the rest has no date
  • 7held up in transit, at port or in customs

You’re not alone: 45% of purchase order lines change after they’re placed,3 and fewer than half of suppliers send electronic confirmations or ship notices.4

Each square is one open purchase order line. The red ones will arrive after they’re needed, and Axyo warns you about each one while there’s still time to act.

The weakest performers spend 10% of logistics cost on expediting, the best 3%. Closing that gap is worth $630K a year.2

The right fix is different for each order line.

Rushing everything that’s late pays for freight that wasn’t needed, and still misses the lines that matter.

Illustrative examples

The supplier is running lateLED drivers · Phoenix

Rush it all$9,000 air freightMove 120and air-freight 80

Pays to fly 300 units when 80 would do.

Tucson has 120 to spare, and 80 by air covers the gap. $58K of orders ship on time, for $2,100

The planned lead time is out of date200A breaker panels · Tucson

Rush it$4,800, and again next time9 weeksnot 6

The next order is placed on the old lead time and runs late too.

The last 8 receipts took 9 weeks. Order 3 weeks earlier from now on. No more rush freight

Late, but still in timeLED high-bay fixtures · Las Vegas

Rush it$3,200 air freightLet it comeby sea

Pays for speed nobody needed.

Port delays add 7 days, and stock still lasts a week past arrival. $3,200 saved

A direct shipment has gone quietSwitchgear · to a contractor

Waitfor the customer to callNew dateagreed 9 days ahead

The contractor finds out on site, with a crew waiting.

No ship notice 2 days after the ship date. The supplier is chased and the customer gets a firm date early. Customer kept informed

Before Axyo recommends moving LED drivers from Tucson and air-freighting 80, it checks:

  • Will the confirmed date hold?No confirmation yet, and this supplier runs 12 days late.
  • Will it arrive before stock runs out?No. Predicted Dec 16. Phoenix runs out Dec 8.
  • What’s the cheapest fix?120 from Tucson and 80 by air: $2,100, not $9,000.
  • Can the supplier split the shipment?Yes, confirmed with the supplier.

Axyo checks every open order line against supplier confirmations, ship notices, tracking, stock at every site and the customer orders waiting on it, continuously.

Axyo recommends. Your team decides.

Routine updates go through within limits you set. Rush freight and customer dates wait for your approval.

Illustrative example, one week
Axyo’s recommendations
Your rules
  • Lead time changes after3 receipts
  • Unconfirmed lines flagged after3 days
  • Rush freightYou approve
  • Goes through on its ownUnder $2K

You can change these rules any time.

263 routine updatesapplied automatically, within your rules
  • Expected arrival dates updated on 214 open lines
  • Planned lead times updated on 37 items
  • Stock moved between sites for 12 items
4 bigger decisions wait for your approval$163K of customer orders at stake
  • LED drivers, PhoenixMove 120 from Tucson, and air-freight 80.
    $58K

    Held. Reason recorded, and Axyo keeps watching.

  • Switchgear, direct to a contractorGive the contractor a new date of Dec 15.
    $41K

    Held. Reason recorded, and Axyo keeps watching.

  • Copper building wire, Las VegasAsk the supplier for a date on the 40 reels still owed.
    $37K

    Held. Reason recorded, and Axyo keeps watching.

  • 200A breaker panels, 3 sitesLead time 9 weeks, not 6. Place the next orders 3 weeks earlier.
    $27K

    Held. Reason recorded, and Axyo keeps watching.

What Axyo watches, continuously

Each risk to when supply arrives, by order line, in your own data and in external signals.

Questions we hear

Lead times are what they are. When something is late, we expedite.

For one late order, expediting is often the right call. For every late line, it pays rush freight on orders that didn’t need it and still misses the ones that did. Axyo flags only the lines that will arrive after they’re needed, early enough for a cheaper fix: stock from another site, a partial expedite or a new date for the customer.

The lead time in our ERP is fine.

It is, if someone updates it from actual receipts. Many planned lead times are set once and rarely revisited. Axyo compares the actual order-to-receipt time with the planned lead time for each supplier and item, and recommends an update only when the gap holds over several receipts.

The supplier confirmed the date.

Confirmed dates hold for some suppliers and not for others. Axyo tracks each supplier’s record of keeping its confirmed dates, and predicts when each open line will really arrive from that record, not from the confirmation alone.

We’ll hear about delays from the supplier.

Large suppliers often send change notices. Many others don’t: fewer than half of suppliers send electronic confirmations or ship notices.4 Axyo treats silence as a signal: no confirmation after a set number of days, or no shipment by the ship date.

Chasing every purchase order isn’t worth it.

Agreed. Axyo flags only the lines that will arrive after stock runs out or after a customer order is due, ranked by the sales at risk, so buyers follow up on those and nothing else.

Our suppliers are just unreliable. There’s nothing we can do.

Sometimes that’s true. But buyers change purchase order lines four times as often as suppliers do.3 Axyo separates the two, and recommends fixing the internal causes too, such as orders placed inside the supplier’s quoted lead time.

Changing lead times every time a supplier is slow causes chaos.

It can. Axyo changes a planned lead time only when a shift lasts over several receipts, beyond a threshold you set. A one-off delay is handled on that order, not by changing the plan.

Drop ships go straight to the customer, so they’re the supplier’s problem.

Until the customer calls you. Axyo tracks each direct-ship line against the date you promised. No ship notice or tracking after the ship date is a warning, and Axyo recommends chasing the supplier, shipping the shortfall from stock or giving the customer a new date early.

How early will we know?

As soon as a line starts to slip: a confirmation that doesn’t come, a confirmed date that this supplier usually misses, a short shipment or a vessel running late. That is usually days or weeks before the item runs out, while moving stock or a partial expedite still works.

What data do you need?

Purchase orders and receipts, supplier confirmations by email, portal or EDI, ship notices and tracking, stock by site and open sales orders. Most of it is already in your ERP. Axyo adds vessel schedules, and port and customs status.

Sources

1. Based on Axyo’s $250M sample distributor: an assumed $9M a year of freight and logistics spend, with expediting at 10% of it, against 3% for the best performers (see note 2).

2. Top performers spend 3% of total logistics cost on expediting; bottom performers spend 10%. APQC, reported by Supply & Demand Chain Executive, 2020. Supply & Demand Chain Executive

3. 45.4% of purchase order lines changed in the third quarter of 2025: buyers changed 40.7% of lines and suppliers 10.2%, across $5 billion of direct spend on SourceDay’s platform. SourceDay sells purchase order collaboration software. SourceDay

4. Supplier participation in electronic order confirmations, ship notices and invoices averaged 42.8% across more than 4,000 buying organizations. SPS Commerce, 2026. SPS Commerce sells supplier network and electronic data interchange services. SPS Commerce

The other figures on this page are illustrative, based on Axyo’s $250M sample distributor.

Related: Stockouts and Lost SalesSupplier Performance and RiskProduction Delays

Start with a free Value Assessment

Find out how much late supply cost you last year, where, and why

  1. 1Send 12 months of purchase orders, receipts and sales
  2. 2See which supply arrived late, why, and what it cost
  3. 3Try it on one supplier group*

* Or one site. We agree in writing, before the trial starts, what success looks like, and compare the results with the rest of your business. Examples on this page are illustrative.